Ohio River Bridge, United States of America

Информация по проекту

Расположение: Louisville, США

  • Construction: Cable-stayed pylon bridge
  • Height of pylons: approx. 90 m
  • Length: 762 m
  • Span: max. 365 m
  • Construction period: 2012 – 2016

Требования

  • Complex shapes with backward and forward inclination, as well as slightly curved pylons
  • Integration of the boxes for the stay cables
  • Transfer of high loads with at the same time tight tolerances
  • High requirements for the 
  • Tight construction schedule without breaks during the winter
  • Safe acces and working platforms in each construction section

Клиент

Walsh / Vinci Construction

Преимущества для клиента

  • Planning solution for formwork and scaffolding from one source
  • Cost-efficient execution due to use of system components from the PERI Rental Park
  • Meeting tight tolerances and schedule demands
  • Extensive and continuous site service and engineering support
  • High safety during all construction phases
Picture of Mike LaSalle, Senior Project Superintendent, Walsh / Vinci Construction
Mike LaSalle
Senior Project Superintendent

The ACS Self-Climbing System and heavyduty VARIO formwork have allowed us to meet the project’s tight tolerances and schedule demands. PERI's extensive site service and engineering support have aided us in tackling the many project complexities.

PERI-решение

  • Project specific formwork and shoring planning for the 5 construction sections
  • Split in half formwork solution for the section with the steel stay anchor boxes to avoid interruption of the climbing process
  • Planning and delivery of heavy-duty shoring with VARIOKIT system components from the PERI rental stock
  • Project-specific stiffening of the wall formwork with steel whalers in order to reach tight tolerances
  • Pre-assembly of the formwork elements including an insulation between the ribs of the forms for concreting during winter
  • Planning and delivery of working platforms and access with the PERI UP modular scaffold